This is a Catch & Release Fishery. All Fish are put back, and not taken for eating.
Pictures of the new toilet and shower block. The 2 rooms center and right are the Mens and Womens shower/toilet rooms, the room on the left is a store room. This picture was taken on the 19th of June.
Pictures of the new toilet and shower block. This picture was taken on the 26th of June, and it now has the roof half done.
Pictures of the new toilet and shower block traveling from Marks house in the direction of all the pits. This picture was taken on the 26th of June.
Pictures of the new toilet and shower block, with the Middle Pit situated on the lefthandside of the sign on the tree. This picture was taken on the 26th of June.
This is a picture of the new toilet and shower block, with the Middle Pit situated on the lefthandside. This picture was taken on the 31st of July, with the outside looking completed. I have yet to find out if they have been fitted out, or when they will be done.
The Toilet/Shower Block is going to be state of the art building. It is having 2 concrete ramps that will meet on a flat top section at the doors, which will be approx' 1 metre wide. The Toilet/Shower Block is being fitted out with hand rails, making it completely equipped for disabled use. The floor has just been laid, and has been fitted for a heated floor. The very first door from the left will have fitted unit with 2 sinks, allowing campers to do washing up of utensils; and will have a boiler room. The second room will be the Women's Section, and will have a Mirror. And the right door are the Men's shower block, both consisting of a power shower, fully tiled, and 2 toilets. The roof will be Solar panelled, and will be able to support a percentage of the energy needs of the building. Outside on the far right end of the building, there is a waste sink for chemicals and another for waste water, and an outside tap. Completion is a while away yet.